Serving Tulsa & nearby communitiesOpen 9am–8pm CST · 7 days a week
Tulsa Bath ConversionsCall (918) 273-6010
Home / Shower Installation in Tulsa, OK

Shower Installation in Tulsa, OK

Adding a shower where there wasn't one — a basement bath build-out, a half-bath upgrade, a garage conversion — or installing the shower portion of a larger remodel: this is the page for ground-up shower installs in Tulsa homes.

Call (918) 273-6010 to Schedule
In-Home Design ConsultationsLocal Tulsa Crews1–2 Day Installs Available

Talk to a specialist

(918) 273-6010

Call to schedule your in-home consultation. Open 9am–8pm CST, every day.

Where new showers go in

  • Half-bath to full-bath upgrades — the highest-value conversion in a one-bath house
  • Basement bathrooms — increasingly common in Tulsa's newer south-side builds with finished basements
  • Primary suite additions and garage/bonus room conversions
  • As part of tub-to-shower conversions and full shower replacements

What a complete installation covers

Supply plumbing and a pressure-balanced or thermostatic valve; drain placement (including jackhammering slab where needed — standard in Oklahoma slab homes); a waterproofed base or custom pan; wall system in acrylic or tile; glass, lighting-safe placement and ventilation. New installs are also the cheapest moment to add the touches that cost real money later: a bench, a niche, a handheld on a slide bar, blocking in the walls for future grab bars.

Adding a shower to a half bath? The two questions that decide feasibility are drain access and space (30×30 inches minimum, 36×36 comfortable). Describe your room when you call and the specialist will tell you quickly whether it works.

Related services

Common questions

Can a shower be added to a half bath?
Usually, if there's roughly 9+ square feet to work with and drain access — in slab homes the concrete is opened to run the new drain, which is routine. An in-home visit confirms the specifics.
How much does a new shower installation cost in Tulsa?
It depends on whether plumbing exists nearby, slab vs. crawlspace, and the finish level — a basic stall differs greatly from a tiled walk-in with glass. Call to describe the project; the consultation gives exact numbers.
How long does a new shower install take?
Where plumbing is close by, 2–4 days. Slab drain work, custom tile or moving walls extends the timeline — the consultation gives you an accurate schedule.

Thinking about your bathroom?

Call and describe your space — a local specialist will help you plan the right update and schedule an in-home consultation.

Call (918) 273-6010
(918) 273-6010 — Tap to Call · 9am–8pm